Project Risks

This document outlines potential risks associated with the ECSP1 eCommerce Server Platform project and provides measures to mitigate and address them effectively.

Project Risk Table

Risk ID Name Description Impact Probability Mitigation Plan Responsible
RIS001 Project Scale Creep Project expands beyond original scope, causing delays and budget overruns S2 Medium Strict scope management and regular backlog review Team Lead
RIS002 Lack of Resources Missing necessary skills, knowledge or personnel S2 Medium Skills audit, proactive training, realistic task allocation Team Lead
RIS003 Team Member Illness A key contributor becomes unavailable S3 Medium Cross-training and task redundancy Team Lead
RIS004 Communication Issues Misunderstandings, delays or poor info flow S2 High Set communication routines (dailies, retros), central documentation Team Lead
RIS005 Schedule Slippage Tasks take longer than estimated S2 High Use time buffers, monitor burndown, escalate early Team Lead
RIS006 Unclear Goals & Vision Team doesn't fully understand the product or scope S2 Medium Define goals clearly in planning documents and reviews Product Owner
RIS007 Lack of Motivation Team disengaged, reducing productivity S3 Medium Regular feedback, involvement, recognition Team Lead
RIS008 Inadequate Documentation Missing or outdated technical/process documentation S3 Medium Assign clear documentation tasks, maintain version control Developer / All
RIS009 Work Overlap Multiple members working on same items unknowingly S3 Medium Use issue boards with assignments and ownership Developer
RIS010 Unclear Responsibilities Tasks not clearly assigned S3 Medium Use RACI model or similar for role clarity Team Lead
RIS011 Member Loss A team member leaves the project S2 Low Ensure handovers, backup resources, documentation Team Lead
RIS012 Data Breach Unauthorized access to sensitive data S1 Low Enforce access controls, monitor logs, update security patches Security / Admin
RIS013 LabraNet Shutdown Network environment used by team becomes unavailable S2 Low Backup and prepare fallback network (e.g. local) Admin
RIS014 Server Configuration Issues Misconfigured servers cause deployment or runtime problems S2 Medium Automate deployment via scripts, test in staging Ops / Admin
RIS015 CSC Pouta Misconfiguration VM setup fails or lacks sufficient resources S2 Medium Validate specs before provisioning, monitor resource use Admin
RIS016 CI/CD Pipeline Failures Build/deploy automation breaks S2 Medium Use fallback deploy methods, test pipeline updates incrementally Developer / Admin
RIS017 Web Security Risks Open ports, missing HTTPS, weak authentication S1 Medium Harden services, restrict firewall, use secrets management Security / Admin
RIS018 Deployment Failure Software fails to start or function after deployment S2 Medium Use rollback scripts, test thoroughly before production push DevOps / Admin
RIS019 Credential Loss Passwords, keys, or secrets are lost or leaked S1 Low Use secret managers, rotate credentials, 2FA Security
RIS020 Hardware Issues (Team Devices) Developer or tester device breaks or becomes unusable S3 Medium Use cloud dev environments, backup configs Developer / Team Lead
RIS021 Dependency Vulnerability 3rd party libraries have known security flaws S1 Medium Regular dependency scans, use Dependabot or similar tools Developer / Security
RIS022 Version Control Conflicts Merge conflicts in Git slow down development S3 Medium Encourage small, frequent commits and code reviews Developer
RIS023 Insufficient Test Coverage Lack of automated tests causes undetected bugs S2 Medium Maintain minimum coverage %, write tests for critical logic Developer
RIS024 Environment Mismatch Local vs production config causes unexpected bugs S2 Low Use containerized environments (e.g., Docker), config standardization Developer / Admin
RIS025 Slow Build Times Large codebase or inefficient tooling delays feedback loop S3 Medium Optimize build steps, use caching, parallel builds Developer

Risk Severity (Impact) Levels

Severity Class Description Impact
S1 Force Major – Critical system failure Immediate and total disruption of the project; requiring urgent resolution
S2 High Severity – Major functional impact Significant delays or major disruption; temporary workarounds may exist
S3 Moderate Impact – Manageable risks Noticeable impact on operations; manageable with effort
S4 Low Severity – Minor issue Limited or negligible effect on workflow
S5 Observational – No immediate effect No current impact; potential future concern

Risk Probability Levels

Likelihood Level Description Example Indicators
High Risk is likely to occur during the project unless mitigated - Similar issue has occurred in previous sprints or projects
- Dependencies are known to be unstable or prone to failure
- Risk factors already present (e.g., known configuration bugs)
Medium Risk may occur if not actively monitored or controlled - Occasional issues observed in similar environments
- Human error or miscommunication could realistically trigger it
- Some uncertainty remains in requirements or external services
Low Risk is unlikely, but possible under rare conditions - Has not occurred before, but cannot be ruled out
- Well-documented and controlled area of the project
- Preventative measures already in place and regularly tested

Action Plan for Risk Occurrence

  1. Identify & Assess: When a risk materializes, assess its impact and severity.
  2. Immediate Response: Take pre-planned countermeasures or escalate to the appropriate team members.
  3. Communication: Inform stakeholders, team members, and other relevant parties.
  4. Documentation: Record the incident, response taken, and improvements needed for future prevention.
  5. Review & Adjust: Update the risk management plan based on lessons learned.